The Wugongbu Laos Petrochemical Project participated in the COVID-19 emergency drill
Category:
News
Company News
Author:
Source:
Published Time:
2020-06-02
5 Month 30 Day, in response to the group and company's requirements for epidemic prevention and control in overseas construction, and to ensure that epidemic prevention and control and resumption of work and production proceed simultaneously, the Laos Petrochemical Project conducted a simulated epidemic emergency drill jointly by the general contractor's group international department and some company employees.
The main content of the drill was the measurement of employees' body temperature upon arrival at work. If a fever or suspected case was found, the epidemic prevention and control emergency plan was immediately activated, and emergency disposal work such as reporting, isolation, and disinfection was carried out in accordance with regulations. At the drill site, various epidemic prevention and control emergency teams were on high alert and ready to act, acting swiftly and closely cooperating according to the established plan, accurately and efficiently completing the epidemic emergency drill tasks and achieving the expected goals of the drill.
Through the drill, the feasibility and effectiveness of the emergency plan were reviewed, improving the project department's emergency response capabilities and employees' ability to respond to and handle sudden epidemics. It enables the project department to carry out epidemic prevention and treatment work more scientifically, normatively, and effectively, ensuring the life and health safety of employees in a timely manner and providing effective guarantees for the resumption of work and production.
[Five Construction Departments / Xu Kuanping]
2025-05-26