All
  • All
  • Product Management
  • News
  • Introduction
  • Corporate Outlets
  • FAQ
  • Corporate Video
  • Corporate Brochure

Sun Jinyao went to the Qujing Dyeing Factory project of the Second Engineering Department for inspection and guidance


Category:

Company News

Author:

Source:

Published Time:

2021-08-18

On the morning of August 12, Sun Jinyao, member of the company's Party Committee and secretary of the Discipline Inspection Committee, went to the No. 2 Engineering Project Department's Qujing Dyeing Factory project to inspect and guide the work.

For the Qujing Dyeing Factory shanty town renovation project, based on the existing ventilation and fire protection engineering, a new power distribution engineering contract worth 46,588,300 yuan has been signed. Currently, all equipment and materials for the power distribution engineering have been delivered to the site, and four construction teams have been entering the site successively, working hard to electrify the project.

Sun Jinyao made the following requirements: First, strengthen labor discipline management. Both project management personnel and construction teams must strictly abide by the company's relevant regulations. Second, do a good job in epidemic prevention and control. Personnel entering the site must provide health codes, vaccination certificates, and other relevant documents to ensure their health before entering. At the same time, the project department must prepare corresponding epidemic prevention materials. Third, strengthen on-site safety management. Cable laying, electrical equipment hoisting, and other work require a large number of machinery and personnel to cooperate in construction. All management personnel must attach great importance to safety management to ensure that all work proceeds safely and smoothly. Fourth, management personnel should strengthen their learning, actively obtain relevant certificates, and at the same time, strictly discipline themselves, thoroughly implement the spirit of the eight central regulations, and strengthen the building of conduct and integrity. Fifth, implement all rectification work, and promptly correct the safety and quality problems found at the current stage.

[No. 2 Engineering Department/Chen Huafei Editor/Hu Hengjin]