All
  • All
  • Product Management
  • News
  • Introduction
  • Corporate Outlets
  • FAQ
  • Corporate Video
  • Corporate Brochure

The group has won 7 Luban Awards and 10 National Excellent Quality Awards in two years.


Category:

Group News

Author:

Source:

Published Time:

2019-12-17

  12 Month 8 Day, 10 Day, 2018-2019 Annual National Excellent Engineering Award Summary and Commendation Conference, Construction Industry Technological Innovation and 2018-2019 The annual China Construction Engineering Luban Award (National Excellent Engineering) Commendation Conference were held successively at the Beijing Conference Center. Group 7 projects won the Luban Award, including overseas Luban Awards 2 item; 10 projects won the National Excellent Engineering Award, including National Excellent Engineering Gold Award 1 item, overseas National Excellent Engineering Award 1 item. The group won all 2018 year to 2019 year Yunnan Province Luban Awards, once again consolidating its leading position in the Yunnan Province construction industry.
    7 Luban Award projects are: Yunnan Haigeng Conference Center Business Hotel, Yunnan Province Diqing Prefecture Shuoduo Ganghe Xiaozhongdian Water Conservancy Hub Project, Guangxi Baikuang Group Xinshan Aluminum Industry Demonstration Park Coal-Electricity-Aluminum Integrated Project 300kt/a Aluminum Water Project, Baoshan Convention and Exhibition Center, Dianxi University of Applied Technology Headquarters Construction Project 1# Yun Education Building, Vietnam-China Friendship Palace Project (overseas), Industrial and Commercial Bank of China Co., Ltd. Vientiane Branch Office Building (overseas). 10 National Excellent Engineering Award projects are: Dali to Lijiang Expressway Project (National Excellent Engineering Gold Award), Baida · Yu Shang Xicheng (Phase 1), China Mobile Yunnan Company Chenggong Communication Production Building and Regional Service Center Project, Kunming Dianchi International Convention and Exhibition Center Pavilion and Supporting Commercial Project, Yiliang County Culture, Sports, Trade and Commerce City Project, Lincang City Public Security Bureau Business and Technical Office Building, Kunming Institute Scientific Research and Experiment Building Construction Project, Tengchong Yongxing Wealth Center Construction Project, Kunming First People's Hospital Beishi District Hospital Construction Project, Laos Vientiane Dongmake Water Treatment Plant Renovation and Expansion Project (overseas).
    2018 year to 2019 Year, the Group's quality improvement management achievements were fruitful, and the number of quality improvement awards reached a historic high. Since the integration and reorganization of Yunnan Construction Investment Group, Dianxi University of Applied Technology Headquarters Construction Project 1# Yun Education Building is the first project under the Group's qualification to win the Luban Award in China, and Guangxi Baikuang Group Xinshan Aluminum Industry Demonstration Park Coal-Electricity-Aluminum Integrated Project 300kt/a Aluminum Water Project is the first industrial Luban Award project, and Yunnan Province Diqing Prefecture Shuoduo Ganghe Xiaozhongdian Water Conservancy Hub Project is 2018 year Luban Award winning project, the only water conservancy project.
    As of now, the Group has won a total of China Construction Engineering Luban Awards 41 item, National Excellent Engineering Award 71 item, China Water Conservancy Engineering Quality (Dayu) Award 2 item, China Civil Engineering Zhan Tianyou Award 1 item, China Construction Engineering Steel Structure Gold Award 17 item, China Installation Engineering Quality Award (Installation Star) 22 item, ministerial and provincial level excellent engineering awards 500 more items.  
    As the highest honor in the field of Chinese construction engineering, the Luban Award has been established since 1987 year, is an award guided by the Ministry of Housing and Urban-Rural Development and implemented by the China Construction Industry Association, is the highest award for the quality of construction projects in China, and is known as the " Oscar " of Chinese construction engineering quality, and is also the dream award for every construction company. The National Excellent Engineering Award was established in 1981 year, the competent authority is the National Development and Reform Commission, and the organizer is the China Construction Enterprise Management Association. It is the earliest and highest-level national honorary award in the field of engineering construction quality in China, which is cross-industry and cross-professional. The National Excellent Engineering Gold Award is the highest honor in the field of engineering construction, and plays a leading and exemplary role in the industry.

Introduction to Luban Award winning projects:

 

 1. Yunnan Haigeng Conference Center Business Hotel : The project is located in the Dianchi National Tourism Resort Area of Kunming City, adjacent to Dianchi Lake and Haigeng Hall, with beautiful surrounding environment. It is a multi-functional, intelligent and green building integrating accommodation, catering, meetings and fitness. The project covers an area of 81.65 mu, with a total construction area of 8.6 square meters, and a building height of 23.4 meters, with one underground floor and six above-ground floors. The Yunnan Haigeng Conference Center Business Hotel undertakes the reception tasks of important international and domestic conferences in Yunnan Province, and is a place for Yunnan Province's external exchanges and holding important events. Since its operation, all systems have been running normally, with complete functions. It has successively received representatives of the South-South Cooperation Forum and tourists from all over the world, and has been well received by all sectors of society.
    Construction Unit: Yunnan Construction Investment Second Construction Co., Ltd.

 

2. Yunnan Province Diqing Prefecture Shuoduo Ganghe Xiaozhongdian Water Conservancy Hub Project : Located in Diqing Tibetan Autonomous Prefecture, with a total investment of 11.57 billion yuan, and a total reservoir capacity of 1.55 billion cubic meters, it is a large ( 2 ) type reservoir project. The main dam type is a concrete gravity dam, with a dam crest width of 8.4 meters, and a maximum dam height of 53.5 meters. The secondary dam is about 400 meters away from the main dam, and the dam type is a concrete gravity dam, with a dam crest width of 8.4 meters, and a maximum dam height of 27.0 meters. After the completion of this project, it improved the ecological environment of the upper and middle reaches of the Yangtze River, and is another tourist destination after Shangri-La Pudacuo 5A National Forest Park, reducing the area of soil and water loss by 1.5 ten thousand mu, providing an average annual irrigation water volume of 695 ten thousand cubic meters, and increasing the irrigated area of farmland and pasture by 1.6 ten thousand mu. It plays an important role in enhancing the development of agriculture and animal husbandry in the Tibetan areas of the plateau, accelerating the pace of poverty alleviation and enrichment in the Tibetan areas, and achieving the prosperity and stability of the Tibetan ethnic groups. It is a demonstration project and a people's livelihood project for targeted poverty alleviation in the Tibetan areas of the country.
    Construction Unit: Yunnan Construction Investment First Water Conservancy and Hydropower Construction Co., Ltd.

 

3. Guangxi Baikuang Group Xinshan Aluminum Industry Demonstration Park Coal-Electricity-Aluminum Integrated Project 300kt/a Aluminum Water Project Located in Xinshan Aluminum Industry Demonstration Park, Tianyang County, Baise City, Guangxi. The total investment of the project is approximately 24 100 million yuan, with a factory area of 497100 square meters and a total construction area of 226738 square meters. This project mainly consists of 220kv switch stations, main control rooms, aluminum water workshops, electrolytic flue gas purification, casting workshops, anode assembly workshops, alumina warehouses, and other supporting auxiliary projects. The structure is mainly single-story steel structure workshops. The electrolytic cells use the advanced and mature technology of 420kA prebaked electrolytic cells, with a total of 268 electrolytic cells. The project started on 2014 year 11 Month 20 day, and was completed on 2017 year 1 Month 20 day. Since its commissioning, it has achieved full compliance and production, and all energy consumption indicators are lower than the industry average. The equipment operates stably, safely, and reliably, and its technical and economic indicators are industry-leading.

    Construction Unit: China Nonferrous Metals Industry No. 14 Metallurgical Construction Company

Participating Units: Yunnan Construction Investment Machinery Manufacturing and Installation Engineering Co., Ltd., No. 14 Metallurgical Construction Group Yunnan Furnace Kiln Engineering Co., Ltd.

 

    4. Baoshan Convention and Exhibition Center Located at the intersection of Zhengyang North Road and North Fourth Ring Road, Longyang District, Baoshan City. It is 115.4 meters long, 103.0 meters wide, 30 meters high, with a construction area of 31068.65 square meters. It has one underground floor and three above-ground floors, with a frame structure and a seismic fortification intensity of 8 degrees. It includes 1112 main venues 1 and 22 small and large meeting rooms. It is a modern, comprehensive public building that integrates conferences and performances, with complete supporting facilities and low-carbon environmental protection. It was completed on 2011 year 12 Month 10 day, and was completed on 2018 year 3 Month 19 day, 10 sectional projects, 47 sub-sectional projects, 2357 inspection batches, all of which passed the acceptance inspection on the first attempt, with high-quality processes and excellent results. Since its commissioning, it has hosted numerous large-scale conferences, cultural performances, and public welfare activities, providing a new place for local residents to live, entertain, and relax. It has made outstanding contributions to promoting the economic and social development of Baoshan and the political, economic, and cultural exchanges in the ASEAN economic circle.

Construction Unit: Yunnan Construction Investment Fifth Construction Co., Ltd.

 

    5. Dianxi University of Applied Technology Headquarters Construction Project 1# Yun Education Building Located at No. , Haiyue Street, Haidong Mountain New Town, Dali City, Dali Prefecture. It is the only applied technology university in a minority ethnic area in the country, specifically designated by the Ministry of Education for poverty alleviation in the border mountainous areas of western Yunnan, jointly built by the Ministry of Education and the Yunnan Provincial Government. It shoulders the historical mission of national poverty alleviation and development and promoting employment. 1 The Yun Education Building has a total construction area of 1# ten thousand square meters, a total height of 4.46 meters, and a total project cost of 75.8 100 million yuan. Among them, the underground floors 1.45 to 1 are used for garages, civil defense, and equipment rooms. The main building's above-ground floors 3 to 1 are for the graphic center, 10 floor is for the Yun Education Center, 10 are for the graphic center, 14 floor is for the office area, and the annex building is for the conference area (different functional areas have independent transportation). The building is built along the mountain, staggered and orderly. In particular, the exterior facade is arranged in a staggered manner according to the functional zoning, forming a 15 are for the graphic center, 17 box staggered and superimposed " structure, with a strong sense of rhythm, which is the landmark building of Dianxi University of Applied Technology. The project was completed on day. 2016 year 6 Month 8 day, and was completed on 2017 year 12 Month 26 Construction Unit: Yunnan Construction Investment Holding Group Co., Ltd.

Participating Units: Yunnan Construction Investment Second Construction Co., Ltd., Yunnan Construction Investment Second Installation Engineering Co., Ltd.  

Vietnam-China Friendship Palace Project (Aid to Vietnam):

 

    6. The Vietnam-China Friendship Palace is a large-scale cultural project aided by the Chinese government to Vietnam. Located in the southwest development zone of Hanoi. , The total land area is approximately , hectares, and the total construction area is 3.3 square meters. 13966 The exterior decoration of this project includes glass curtain walls, stone curtain walls, aluminum plate curtain walls, steel structure glass awnings, and glass skylights. The interior floor finishes include brick, marble, carpet, and solid wood flooring. The stage and auditorium in the center of the Friendship Palace are professionally designed for acoustics. The project was completed on   day, and after its completion and commissioning, 2014 year 12 Month 10 day, and was completed on 2017 year 10 Month 31 it has become an important platform for Vietnam to hold celebrations, receive foreign affairs etiquette, and conduct cultural exchanges between China and Vietnam. , It is also used to hold large-scale cultural performances and conferences, as well as folk cultural exchange activities. , Industrial and Commercial Bank of China Co., Ltd., Vientiane Branch Business Premises (Overseas):

 

 

    Participating Units: Yunnan Construction Investment Second Construction Co., Ltd., Yunnan Construction Investment Second Installation Engineering Co., Ltd.

 

    7. This is the first self-built business office building of the Industrial and Commercial Bank of China's overseas institutions. It is located at the intersection of the main scenic road and ASEAN Road in Vientiane, the capital of Laos, to the northeast of the famous Patuxai and the Prime Minister's Office, approximately meters from Patuxai. This project is a frame structure with a seismic fortification intensity of six degrees and a design service life of 900 years. The total building height is 50 meters, with one underground floor and five above-ground floors. The construction land area is 23.9 square meters, and the total construction area is approximately 5002 square meters, of which the above-ground construction area is 10253 square meters and the underground construction area is 8018平方米,地下建筑面积2235 Square meters. The total cost is 9754.43 Ten thousand yuan, 2014 year 2 Month 1 Started on this day, and completed on this day of the same year. 12 Month 7 More than four years after the project was put into use, all systems have been operating normally, providing a large number of jobs for the local area and driving economic development in Laos.

    Participating Units: Yunnan Construction Investment Second Construction Co., Ltd., Yunnan Construction Investment Second Installation Engineering Co., Ltd.



     Introduction to the National Excellent Award-winning Project:

 

    1. Dali to Lijiang Expressway Project (National Excellent Gold Award) :Is a national " The Belt and Road Initiative An important section connecting the north and south Silk Roads, an important channel for exiting Yunnan and entering Tibet, and an important passage to Sichuan. It is China's first expressway to reach the Tibetan area, and also connects the two internationally renowned tourist destinations of Dali and Lijiang. It is known as " The most beautiful expressway . 188 billion yuan, with a total length of 259 kilometers, making it the expressway with the largest investment scale and longest construction length in Yunnan Province that has been put into operation. Since the Dali-Lijiang Expressway opened to traffic on 2013 year 12 Month 30 After nearly 6 years of operation, the integrity rates of the main engineering structures such as subgrade, pavement, bridges, and tunnels have remained at a high level. It has been praised by the industry and the public for its engineering quality, safety facilities, ecological protection, cultural landscape, and its contribution to regional economic development and poverty alleviation in the province. It is a classic work in the history of expressway construction in our province, and it is of great significance to accelerating the transformation of transportation development methods in our province, promoting the " Strong Transportation Province strategy, and building a high-quality and efficient transportation guarantee system. " Milestone meaning.

    Participating Units: Yunnan Provincial Construction Investment Holding Group Co., Ltd. Road and Bridge General Contracting Department

 

    2.  Top 100 · Yue Shang West City (Section 1) :The project has a novel design, complex structure, and high construction difficulty. It is a super-high-rise integrated office building with a total height of 129.6 meters, and the maximum building height is 140.5 meters. The main buildings include 1 buildings A and annex building, 1 buildings B and annex building (including the corresponding basement project), with a total construction area of 96148.6 The exterior decoration of this project includes glass curtain walls, stone curtain walls, aluminum plate curtain walls, steel structure glass awnings, and glass skylights. The interior floor finishes include brick, marble, carpet, and solid wood flooring. The stage and auditorium in the center of the Friendship Palace are professionally designed for acoustics. The project was completed on

    General Contractor: Yunnan Construction Investment Fourth Construction Co., Ltd.

 

    3. China Mobile Yunnan Company Chenggong Communication Production Building and Regional Service Center Project : Located in the eastern new urban area of Chenggong New District, Kunming City, west of Kunluo Road, and adjacent to the Chenggong New District Public Security Bureau on the west side. The total construction area is 32085.69 square meters, consisting of a twenty-story main building A buildings (including a two-story annex building, with a connecting corridor between the main building and the annex building) and a two-story production auxiliary building, connected to the main building by a corridor. The height of the main building is approximately 96.7 meters, and the production auxiliary building is approximately 15.3 meters. The project integrates production, office, business services, and data exchange, and is China Mobile Yunnan Company's largest investment, largest single building area, and most complete modern communication production and comprehensive service building in Yunnan. Construction started on 2012 year 1 Month 30 day, 2016 year 4 Month 28 Construction Unit: Yunnan Construction Investment Holding Group Co., Ltd.

    General Contractor: Yunnan Engineering Construction General Contracting Co., Ltd.

 

    4. Kunming Dianchi International Convention and Exhibition Center Pavilion and Supporting Commercial Project : Located on the Fubao Peninsula, one of the three and a half peninsulas of Dianchi Lake, covering an area of approximately 2331 mu, integrating exhibition, tourism, leisure, vacation, and trade functions. The building has a unique shape, and the core area of the building is based on the design concept of " Peacock Screen, Auspicious Spring City , showcasing Kunming's unique urban culture and international landmark style. The steel structure mainly includes 1-13 No. exhibition hall roof arch frame, roof system project, roof siphon drainage system project, etc. After the completion of the project, it has hosted many sessions of the China - South Asia Expo and other large-scale events, and is one of the most important event venues in Kunming City.

    General Contractor: Yunnan Construction Investment Second Construction Co., Ltd.

    Participating Units: Yunnan Construction Investment First Survey and Design Co., Ltd., Yunnan Construction Investment Second Installation Engineering Co., Ltd., Yunnan Construction Investment Installation Co., Ltd., Yunnan Construction Investment Steel Structure Co., Ltd.

 

    5. Yiliang County Culture, Sports, Trade and Commerce City Project : Located northeast of the intersection of East Ring Road and Latitude 1st Road in Yiliang East City New District, with a total construction area of 54971.3 square meters. The entire project consists of 2 buildings 2F shops, 1 buildings 6F apartment buildings, 1 buildings 3F restaurants (including a basement level), 2 buildings 4 ~ 5F office buildings, 4 buildings 5F shopping malls, 1 shops + public toilets, all of which are frame structures. The plot ratio is 1.24 , the greening rate is 30.65%

    Survey and Design Unit: Yunnan Construction Investment First Survey and Design Co., Ltd.

    General Contractor: Yunnan Construction Investment Second Construction Co., Ltd.

 

 

    6. Lincang City Public Security Bureau Business and Technical Building : Located on the west bank of the Xihe River in Lincang City, the project consists of a main building and an annex building, with a total construction area of 40987.6 square meters, the main building is 97.3 meters , above ground 23 floors, underground 2 floors, annex building 3 floors, underground 1 Floor. The main building and annex are connected by 15.1 meters high atrium, the roof is a glass skylight, bright and transparent; the whole building is a modern public security bureau technical office building integrating 110 command, emergency response, firearms storage, archives management, criminal investigation technology, citizen services and other functions. Completed on 2012 year 9 Month 10 day, 2015 year 9 Month 18 day. After the completion of the project, it complements the news center, one civil and one military, and has become a landmark building in Lincang City, a border town.

    General Contractor: China Nonferrous Metals Industry No. 14 Metallurgical Construction Company

    Participating Units: Yunnan Construction Investment No. 12 Construction Co., Ltd.

 

    7. Kunming Institute Research and Experiment Building Construction Project Located near the intersection of Xuefu Road and Hongshan East Road in Wuhua District, Kunming City, with a construction area of 52192.8 square meters, the architectural appearance design is " rectangular The exterior decoration is mainly stone and glass curtain wall, which is a comprehensive office building integrating office and parking lot.

    General Contractor: Yunnan Construction Investment Second Construction Co., Ltd.

 

    8. Tengchong Yongxing Wealth Center Construction Project: Located in the center of Tengchong City, at the intersection of Emerald East Road and Rehai Road, it is a sky street commercial complex with Tengyue cultural style. The total construction area of the project is 70219 square meters, above ground 42727 square meters, underground 27492 square meters, underground 2 floors, above ground 5 floors, building height 23.8 meters. The overall planning is " one axis, one belt, two hearts fan-shaped layout, atrium enclosure, natural lighting and ventilation, the architectural style perfectly combines with Tengyue culture. Since its commissioning, it has attracted many merchants from home and abroad, 200 households to enter the market, solving the local 1000 people's employment, has become an indispensable highlight in the economic development of Tengchong.

    General Contractor: Yunnan Construction Investment No. 5 Construction Co., Ltd.

 

    9.  Kunming First People's Hospital North City District Hospital Construction Project: It is a comprehensive hospital with novel design, complete functions and energy saving and environmental protection. , The total construction area of the project is 137475 square meters and the underground construction area is 101493平方米,地下建筑面积33982 square meters, mainly composed of ward building, outpatient building and the second phase administrative and teaching building, medical technology building, infection building and auxiliary projects.

    General Contractor: Yunnan Construction Investment Fourth Construction Co., Ltd.

 

    10. Laos Vientiane Dongmakay Water Treatment Plant Renovation and Expansion Project: It is an industrial plant building with pools as the main part, and other supporting structures, steel structures and pipelines as auxiliary parts. The total land area is 21621 square meters, the total construction area is 2521 square meters, the newly built road area is 2521 square meters, and the length of the newly built drainage ditch is 1650 meters. The main structures include: water distribution wells 1 sets, horizontal flow sedimentation tanks 1 sets, V type filter pools 1 sets, clear water pools 2 sets, all are reinforced concrete structures. The main buildings include: water supply pump room, chemical dosing room, backwashing pump room and blower room, comprehensive building, substation, all are frame structures. The project decoration is simple ordinary decoration. , The roof is a red tile sloping roof, and the roof truss is a light-weight square steel roof truss.

    General Contractor: Yunnan Construction Investment Holding Group Co., Ltd.

    Participating Units: Yunnan Construction Investment No. 4 Construction Co., Ltd., Yunnan Construction Investment No. 2 Installation Engineering Co., Ltd.

 

【Reporter: Saye Ying   Miao Jian        Editor in charge: Saye Ying】

< 1...345...214 > 跳转到