All
  • All
  • Product Management
  • News
  • Introduction
  • Corporate Outlets
  • FAQ
  • Corporate Video
  • Corporate Brochure

Acceptance of the fire protection project of section 22 of the Baoshan shanty town renovation project


Category:

Company News

Author:

Source:

Published Time:

2019-01-14

1 Month 9 Day Baoshan shanty town renovation project, section 22 shanty town renovation project A05 The fire protection project of the land plot has successfully passed the acceptance. Participating units include Yunnan Xiangtou Group, Baoshan City fire protection inspection department and relevant responsible units.

On-site, the acceptance personnel A05 The quality, appearance quality, and linkage operation of the HVAC and fire protection sub-item projects of the land plot were professionally inspected and accepted. At the review meeting, the acceptance team believed that the fire control room, the automatic alarm system, smoke exhaust system, water fire extinguishing system, and evacuation guidance system in each fire compartment of the basement were qualified in terms of linkage operation, and the engineering quality met the design documents and relevant standards, and made a written confirmation of qualification.

 Yunnan JianTou Second Installation Engineering Company  

Fire control room acceptance

 Yunnan JianTou Second Installation Engineering Company  

Fire pump room acceptance

 Yunnan JianTou Second Installation Engineering Company  

Ventilation system acceptance

 Yunnan JianTou Second Installation Engineering Company  

Water pump connector acceptance

 Yunnan JianTou Second Installation Engineering Company  

Water pump connector acceptance

 

 

Department 9 / He Yanqi

< 1...345...214 > 跳转到